INVESTMENT SITES

Power & Connectivity

  • Power network provider Seiverkot Oy
  • Available immediate load to the site 25 MW
  • Load may be update to 100 MW or more, if needed
  • Nearest 110 kV connection point 300 m from the plot
  • Green energy available
  • Multiple data network operators available
  • Distance to national main fibre 1 km

Site & Plot

  • Green field site
  • Approximately 15 hectares in total
  • Area may be sectioned into three  5 hectare plots
  • Flat surface, mostly solid rock, no natural risks
  • Zoning complete 2017

Water & Cooling

  • Fresh water and sewerage system available nearby and constructed as needed
  • Excess heat energy may be reutilized in a separate, independent heat line system

Location & Access

  • Koninpääntie, Seinäjoki (62.727554, 22.885162)
  • Two separate street connections and immediate passage to highway VT 19
  • Distance to Seinäjoki logistic hub 3 km and city centre 5 km
  • Distance to national main train line 5 km (junction of five railways) with connection to Helsinki in 2h 35 min